We can work on GIS using (QGIS) free application

Write a report (minimum 350 words or two A4 pages) about the Hydrology around Falaj Daris.(In Oman)

By reading your report, one should be able to answer the below questions:

Is the protection zone referred by UNESCO, correct from hydrological point of view? How to define the best protection zone for the falaj?
Is the effluent flowing in the catchment of Falaj Daris? What is the distance between the effluent and Umm Al Falaj?
What do you (the author) suggest to protect the falaj subsurface part?

Sample Solution

which end-up paying than usual. It’s better to allot some money for quality sooner than the later which help us to identify the issues in the beginning stage itself. There are the some of the estimation methods that experts use to estimate the project plans, those are, 1. Analogous Estimation 2. Parametric Estimation 3. Bottom-Up Estimation 4. Activity-Based Estimation Analogous Estimation: It’s one way to estimate the project and it perhaps estimate from the alike projects, so that they would easily make it done. It takes similar estimation from another project as both are looks like same. We would definitely go with this approach when two projects are having the same resources and complication. In this approach, we can modify the anything even once the plan got approved by the panels. Moreover, Panels reveal their decision after having detail understanding of the submitted project plan which requires some years of experience. Parametric Estimation: Usually this estimation will calculate based on core parameters which are common to other projects as well. For instance, Victor decided to rent two boats from third-party dealers for 4 hours. The dealer replied him like “rent for single boat is $30 per hour”. Victor has estimated his budget and he come to conclusion that he needs to allot $240 for his project. So here the estimation will be calculated based on the two parameters such as no of boats and how many hours. Similarly, the project plan can be changed at any level. Bottom-Up Estimation: This is estimation which takes lots time to estimate and its very detailed estimation for each and every item in the project. Usually, some of the micro management woul>

Is this question part of your assignment?

Place order