We can work on bicycle gantt chart (Operations Management)

bicycle gantt chart (Operations Management)

Paper, Order, or Assignment Requirements

Build a Gantt Chart using Excel spreadsheet showing 12-24 month project management of a new Bicycle introduction using New Product Development Stage Gate Process. Use Stages as start of WBS, Work Breakdown Structure, and develop (make assumptions as necessary) for elements of design and build using concept model below and design statements below;

Main components of Bicycle – for each selection of materials, process, paint or molded color
Frame
Wheels
Tires
Handlebars
Seat
Time estimates – need for milestones, deliverables and sign offs
Idea generation –1 week to formalize, have concept as shown, need to think of materials, processes, testing, qualification
Research – 6 weeks
Develop
Concept – 4 weeks (drawings, schematics, performance specifications)
Pre-pilot build – 4 weeks (concept samples for form, fit, function evaluation)
Pilot production run – 8 Weeks (use selected production processes, assume long lead time tooling has been ordered)
Testing
Develop testing methods – 2 weeks
Conduct alternate materials testing – 4 weeks (metal, plastic, urethane)
Test finished pilot samples – 4 weeks
Analysis
Complete cross-functional team review – 8 weeks, include Sales, Marketing, Production, Purchasing, Customer Service, Suppliers, Dealers, Customers
Introduction
Trial run production – 4 weeks (assembly and operating instructions, sellable units)
First production, fulfill orders for distribution – dealer showrooms – 4 weeks
Full production readiness – 4 weeks
Closing
Completed Lessons Learned report
New Product Development Stages

Before a product can embark on its journey through the four product life cycle stages, it has to be developed. New product development is typically a huge part of any manufacturing process. Most organizations realize that all products have a limited lifespan, and so new products need to be developed to replace them and keep the company in business. Just as the product life cycle has various stages, new product development is also broken down into a number of specific phases.

Order Caclulator

Type of paper Academic level Subject area
Number of pages Paper urgency Cost per page:
 Total:
   

Paper, Order, or Assignment Requirements

Build a Gantt Chart using Excel spreadsheet showing 12-24 month project management of a new Bicycle introduction using New Product Development Stage Gate Process. Use Stages as start of WBS, Work Breakdown Structure, and develop (make assumptions as necessary) for elements of design and build using concept model below and design statements below;

Main components of Bicycle – for each selection of materials, process, paint or molded color
Frame
Wheels
Tires
Handlebars
Seat
Time estimates – need for milestones, deliverables and sign offs
Idea generation –1 week to formalize, have concept as shown, need to think of materials, processes, testing, qualification
Research – 6 weeks
Develop
Concept – 4 weeks (drawings, schematics, performance specifications)
Pre-pilot build – 4 weeks (concept samples for form, fit, function evaluation)
Pilot production run – 8 Weeks (use selected production processes, assume long lead time tooling has been ordered)
Testing
Develop testing methods – 2 weeks
Conduct alternate materials testing – 4 weeks (metal, plastic, urethane)
Test finished pilot samples – 4 weeks
Analysis
Complete cross-functional team review – 8 weeks, include Sales, Marketing, Production, Purchasing, Customer Service, Suppliers, Dealers, Customers
Introduction
Trial run production – 4 weeks (assembly and operating instructions, sellable units)
First production, fulfill orders for distribution – dealer showrooms – 4 weeks
Full production readiness – 4 weeks
Closing
Completed Lessons Learned report
New Product Development Stages

Before a product can embark on its journey through the four product life cycle stages, it has to be developed. New product development is typically a huge part of any manufacturing process. Most organizations realize that all products have a limited lifespan, and so new products need to be developed to replace them and keep the company in business. Just as the product life cycle has various stages, new product development is also broken down into a number of specific phases.

Is this question part of your assignment?

Place order